Progress travels as WhatsApp messages, missed calls and a spreadsheet called FINAL. By the time it reaches the developer, the delay already has a price.
Floor by floor
Every floor, accounted for.
The same five updates, each pinned to its floor, with a name and a time.Point at any level.Tap a level.
F23Slab pour blocked: rebar shortAlex, just nowBlocked
F21Services: ducts and conduitsAlex, 4 h agoIn progress
F20Facade: glazing units going inContractor, 6 h agoIn progress
F19Fit-out: ceilings and partitionsContractor, 1 day agoIn progress
F18Facade closed, interiors finishingChris, 8 days agoDone
F17Facade closed, interiors finishingAlex, 9 days agoDone
F16Facade closed, interiors finishingContractor, 10 days agoDone
F00 to F1516 levels completeDone
The build, opened up
Progress you can see. Not progress you’re told.
Every stage of the tower in one view, each with the record behind it.
Floor 23. 6:42 PM.
On site · Tower A · Floor 23
Area 3 cannot pour yet.
The top mat of Slab S-23 stops at grid line 3. Right now, only Alex knows.
The capture
Three taps. Gloves on.
Made for one hand, floodlights and work gloves.
1
Pick what was checked. Slab S-23, Area 3, on the plan of the floor.
2
Mark its state. Blocked: rebar short.
3
Add a photo. Level, time and name are stamped on it.
Pinned to Floor 23. Kept exactly as Alex sent it.
How it works
One update. Everyone who needs it.
1
Captured where it happens.Alex records Area 3 as blocked, with a photo. Floor, time and name travel with it.
2
Placed in context.Renakin sets it against the floor, the plan and every open issue, and flags what is late.
3
Seen by the right people.Sam, the developer, sees the full record. Chris, the project manager, owns the next step. Emma, the homebuyer, sees curated progress when it is ready.
6:43 PM · The developer’s office
Sam opens the place where the work stopped.
Sam touches Area 3, and the floor opens with Alex’s photo and the time.
ParkviewTower AFloor 23Area 3
Slab S-23 · Rebar short
Blocked
F23 · S-23 Area 3 · 6:42 PM · Alex
Alex’s photo of Area 3, drawn here as an illustration.
Seen on site
The top rebar mat stops short in Area 3.
Recorded
Alex, site engineer · 6:42 PM
Not known yet
How much is short, and when it can be poured.
Next
Needs an owner
Fictional record. The floor above is a schematic, not a measured model.
The developer's view
The developer’s view, with the same record selected. Sam names Chris as owner. The pour stays blocked.
ParkviewTower A · 24 levels · Noida · demo project
Fictional demo project. Illustrative data.
Levels recorded complete
19of 24
Open issues
2
Blocked
1
Today
Slab pour · Floor 23Blocked
Concrete pour · Floor 22Completed
Services · Floor 21In progress
Levels
Floor 23Slab pour blocked: rebar shortBlocked
Floor 22Slab poured, curing, proppedIn progress
Floor 21Services: ducts and conduitsIn progress
Floor 20Facade: glazing units going inIn progress
Floor 19Fit-out: ceilings and partitionsIn progress
Floor 18Facade closed, interiors finishingDone
Floor 17Facade closed, interiors finishingDone
Floor 16Facade closed, interiors finishingDone
Floor 15Facade closed, interiors finishingDone
F00 to F1415 floors completeDone
Parkview · Tower A · Floor 23 · Area 3
Slab S-23 · Rebar shortBlocked
SEEobserved
Floor 23 · S-23 · Area 3 blocked: rebar shortObserved on site · Alex, 6:42 PM · 1 photo
UNDERSTANDpossible impact · review
Slab S-23 cannot be poured while the top mat in Area 3 is incomplete. Work planned after this pour may move; to be reviewed against the schedule.Possible impact · inferred from the blocked record · not confirmed
ACTwho moves next
Needs an ownerSam decides who moves nextUnassigned
Chris · Project managerNamed by Sam · response needed · the slab stays blockedAssigned
What we’re building
One record. Everything that moves it.
Ten moves on the same record. Each one opens in the app.
Parkview · Floor 23
Slab S-23 · Area 3BlockedAlex records it, 6:42 PM